UK’s Long Duration Electricity Storage (LDES) Cap & Floor Scheme to Launch

The UK’s energy sector is poised for a significant transformation with the upcoming launch of the Long Duration Electricity Storage (LDES) Cap & Floor scheme. Jointly announced by Ofgem and the Department for Energy Security and Net Zero (DESNZ), this initiative aims to bolster the integration of renewable energy sources by supporting large-scale energy storage projects.

Key Features of the Scheme

  • Minimum Storage Duration: Projects must provide a minimum of eight hours of continuous rated power, an increase from the previously proposed six-hour threshold.
  • Project Capacity Requirements: Stream 1 targets well-established technologies with a minimum capacity of 100 MW, while Stream 2 caters to emerging technologies with a minimum capacity of 50 MW.
  • Revenue Assurance: The cap and floor mechanism ensures that projects receive a minimum revenue (floor) while capping maximum earnings, providing financial stability over a 20-25 year period.

Implications for Energy Storage Companies

The scheme is expected to have a profound impact on various stakeholders within the energy storage sector:

  • Invinity Energy Systems: The company’s vanadium flow batteries align with the scheme’s objectives, offering scalable solutions for long-duration energy storage.
  • ITM Power PLC: Specializing in green hydrogen production, ITM Power could see indirect benefits from increased grid stability and renewable energy storage solutions.
  • Gresham House Energy Storage Fund PLC: Focused on grid-scale battery storage, Gresham House is poised to expand its portfolio under the LDES scheme, supporting renewable energy integration.
  • SSE’s Coire Glas Project: The £1.5 billion pumped storage hydro project at Loch Lochy stands to benefit from the scheme, potentially doubling the UK’s storage capacity to 30 GWh.
  • Harmony Energy Income Trust PLC: As a specialist in large-scale battery storage projects, Harmony Energy is well-positioned to participate in the scheme, leveraging its expertise to enhance grid stability.

Environmental and Economic Benefits

By facilitating the deployment of long-duration storage solutions, the LDES Cap & Floor scheme aims to:

  • Enhance Grid Stability: Balancing supply and demand, particularly with the increasing integration of intermittent renewable energy sources.
  • Reduce Consumer Costs: Minimizing the need for expensive grid upgrades and reliance on fossil fuel-based peaking plants.
  • Promote Sustainability: Supporting the UK’s commitment to achieving net-zero emissions by 2050 through the adoption of clean energy technologies.

The scheme’s application window is set to open in April 2025, marking a pivotal moment in the UK’s transition towards a more resilient and sustainable energy system.

#EnergyStorage #LDES #RenewableEnergy #GridStability #NetZero

More News

1

Apr 25

Invinity Secures UK’s Largest Vanadium Flow Battery Project

Invinity Energy Systems is set to make UK energy history with the development of its flagship LODES project, a 20.7…
Read More

18

Mar 25

BYD’s 5-Minute EV Charging Blows Tesla Out of The Water

Chinese electric vehicle (EV) manufacturer BYD has unveiled a ground-breaking charging system capable of delivering up to 1,000 kilowatts (kW)…
Read More

17

Mar 25

Foresight’s Bid at 29% Premium for Harmony Energy Income Trust

Foresight Group LLP has announced a possible cash offer to acquire Harmony Energy Income Trust PLC (HEIT), valuing the company…
Read More

15

Mar 25

Battery Storage Gains Ground in UK’s T-4 Capacity Market Auction

The latest T-4 Capacity Market Auction has awarded long-term contracts to a range of battery energy storage systems (BESS), reinforcing…
Read More

13

Mar 25

Heat Pump Installations Surge in the UK

The United Kingdom has witnessed a significant rise in the adoption of heat pumps, with installations reaching record levels in…
Read More
1 2 3 6

Leave a Reply

Your email address will not be published. Required fields are marked *